Contact
Technology

Kenya to add two undersea cables by 2027, lifting landings from 7 to 9

Kenya to add two undersea cables by 2027, lifting landings from 7 to 9

Key points

  • Two new submarine fibre systems are expected to land in Kenya before 2027, raising total cable landings from 7 to 9.
  • Meta and Safaricom are developing a 4,108km Oman–Mombasa subsea link.
  • Africa-1, about 10,000km, is a multi-country system TeleGeography says should land in Kenya next year.
  • Kenya ranks fifth in Africa for landings after Egypt (15), Djibouti (12), South Africa (9) and Nigeria (8).

4,108 kilometres from Oman to Mombasa, plus a roughly 10,000-kilometre Africa-1 system: Kenya is lining up two new undersea fibre landings before 2027, a build-out that would lift the country’s submarine cable count from seven to nine, Eastleigh Voice reported, citing industry mapping from TeleGeography.

The Meta–Safaricom Oman–Mombasa project is the headline commercial partnership. Africa-1 is described as a multinational route linking France, the Mediterranean, the Middle East and several African markets, with a Kenya landing targeted for next year. Together they are pitched as capacity for cloud, AI training traffic, data-centre interconnect and everyday mobile broadband growth.

Why landing count is not the whole story

More cables improve route diversity when one system is cut by an anchor or a fault. They do not automatically cut consumer prices or fix last-mile congestion on the Athi River–Nairobi corridor. Operators still need terrestrial backhaul, competitive IP transit, and power for coastal landing stations and inland data halls.

On continental scoreboards Kenya already sits fifth for landings — behind Egypt (15), Djibouti (12), South Africa (9) and Nigeria (8). Moving to nine systems would put Nairobi’s coastal gateway in a tighter pack with the big African hubs, provided both projects actually light fibre on schedule.

What to demand in public updates

ICT and Treasury should publish landing windows, local content and security-review milestones without turning every metre of glass into a campaign slogan. Enterprise buyers will watch latency to Europe and the Gulf; households will notice only if outages fall and data bundles stop choking at peak hour.

Technology desk: Technology. Verified package: two systems, Meta–Safaricom Oman link length, Africa-1 scale, 7→9 landing maths, pre-2027 timing language. Commissioning dates and wholesale capacity offers remain the operational proof still due.

Based on Eastleigh Voice reporting and TeleGeography references therein. Operator and regulator notices control final landing dates.